London W1 | Project Case Study – Complex VRF Installation & Lift & Shift
This month’s works in London W1 pushed both planning and execution standards delivered successfully across a live environment with zero compromise on safety or performance.
We supported a major install involving multiple unit removals and replacements, alongside a precision lift and shift of a VR6 unit. All works were carried out within an operational site, requiring tight coordination, controlled lifting, and strict adherence to compliance frameworks.
Scope Highlights
- Full strip out and installation of multiple HVAC units within an active workspace
- Lift & shift relocation of VR6 outdoor unit
- Refrigerant recovery, pipework modification, and full recommissioning
Execution Overview
We began by establishing a controlled working environment:
- Lifting operations configured to spec, including counterbalance verification
- Exclusion zones implemented with defined access/egress routes
- Full electrical isolation and validation procedures completed
From there, the technical sequence was delivered methodically:
- Refrigerant pump down and recovery in line with F-Gas Regulations
- Safe disconnection of pipework and electrics, ensuring contamination prevention
- Controlled lift using strops and shackles, followed by precise relocation onto a prepared, level base
System Reconfiguration
- Pipework cut, cleaned, brazed, and reinsulated
- Nitrogen pressure testing completed to verify system integrity
- Condensate drainage modified to maintain correct fall and performance
Final Commissioning
- System evacuation to required vacuum levels with standing test
- Refrigerant recharge to manufacturer specification
- Full commissioning checks completed (pressures, temperatures, system performance)
Close-Out
- All lifting equipment safely dismantled and removed
- Waste cleared, site left clean, safe, and fully operational
Outcome
A technically demanding project delivered efficiently in a live environment demonstrating capability in complex VRF systems, safe lifting operations, and end-to-end project control.
If you're managing HVAC projects in high-demand environments and need reliable delivery without disruption, we’re ready to support.